Engineering case

Strive to be an Internationally Renowned Integrated Service Provider of Power Energy

Your current location: Home > Engineering case
Huadian Xiamen Jimei Distributed Energy Station (Phase I)

 

Located in Jimei Houxi Industrial Park, the CCHP project consists of a 42.1MW gas turbine, a 9.5MW steam turbine, a HRSG and two lithium bromide units (1,166kW), supplying cooling, heat and power for industrial users. With the thermal efficiency of up to 71%, the project has effectively reduced energy consumption.

QQ截圖20181019094702.jpg

足球任九场开奖直播 手机捕鱼游戏平台 香港六合彩+开奖直播现场开奖 500比分直播完整版 江西快3精准计划 快乐赛车彩票 广西福彩24选7走势图 竞彩足球比分最多能打几关 股票趋势分析方法 喜乐彩和值走势图 欢乐真人麻将所有版 大发排列三计划 今日银行股票推荐 广西快乐双彩开奖查询 彩金捕鱼棋牌 熊猫棋牌是真的吗 常来海南麻将苹果版怎么下载