Engineering case

Strive to be an Internationally Renowned Integrated Service Provider of Power Energy

Your current location: Home > Engineering case
Special Planning for Layout of Central Urban Power Facilities in Zhangzhou City

The special plan has strengthened operability of power grid plan in central urban area of Zhangzhou City and integrated power grid plan into the holistic urban development plan, allowing for adequate space for the substation and power supply corridor,  environment friendly power facility construction and urban development.

(正文)漳州市中心城區電力設施布局專項規劃.jpg


足球任九场开奖直播 做妓女赚钱又舒服 荔枝fm直播赚钱比例 福建十一选五走势 摩登财神 981游戏手机版安卓版 快乐扑克4开奖结果查询 201497期特码资料提供 股票绿色和红色代表什么 贵州十一选五前三走势图 六肖中特期期准99976 何为股票配资 辽宁十一选五预测号码今天 足球比分直播 TG反波胆试玩为什么赚钱 北京赛车pk10免费计划 体彩海南飞鱼6分钟开奖